EnergyPathway.jl
EnergyPathway is a capacity expansion pathway layer built on top of Nosy.jl.
Nosy describes one optimized energy-system snapshot. EnergyPathway links several Nosy snapshots through time, adding deployment, retirement, lifetime, and investment-cost logic so that a model can describe how installed capacity evolves between years.
using EnergyPathwayWhat EnergyPathway Adds
- A
Pathobject containing one NosySnapshotper model year. - A
PathOptobject for discounting, model horizon, default time mesh, and historical capacity. addsnapshot!to register snapshot years as the pathway is built.- Dynamic capacity constraints linking each snapshot to the previous state.
- Deployment and retirement behaviors.
- Lifetime constraints and automatic renewal logic after the last snapshot.
- Year-aware cost, capacity, deployment, and retirement metrics.
Requirements
EnergyPathway uses JuMP through Nosy. You need a JuMP-compatible LP/MILP solver. Pass the optimizer constructor when constructing a Path:
using HiGHS
opt = PathOpt(2020:10:2050)
path = Path(HiGHS.Optimizer, opt)or start with no years and add snapshots explicitly:
using HiGHS
opt = PathOpt()
path = Path(HiGHS.Optimizer, opt)
snap = addsnapshot!(path, 2030)The same form works with any JuMP optimizer constructor; pass it in place of HiGHS.Optimizer.
Author
EnergyPathway is authored by Guillaume KRIVTCHIK.
Pages
- Tutorial: a complete two-year capacity expansion model.
- Examples: worked examples built in the style of the Nosy examples.
- EnergyPathway Concepts: the main objects and behaviors.
- API Reference: exported EnergyPathway types and functions.